Faili:5n PERT graph with critical path.svg

Faili halisi(faili la SVG, husemwa kuwa piseli 405 × 188, saizi ya faili: 4 KB)

Faili hili linatoka Wikimedia Commons. Maelezo yapo kule kwenye ukurasa wake wa maelezo unaonekana hapo chini.
Commons ni mahali mtandaoni pa kuhifadhia jalada na hati za picha na sauti zenye leseni huria. Unaweza kuisadia.

Muhtasari

Maelezo The graph was created with Graphviz from the graph specification below.
Tarehe
Chanzo Kazi yangu
Mwandishi hu:User:Illes
Ruhusa
(Kutumia faili tena)
The image is in the public domain.
digraph untitl {
	node [ fontname="Helvetica-Bold", shape="circle", width="0.3", style ="setlinewidth(2),filled" color="black", fillcolor = "pink", label=""];
	edge [ fontname="Helvetica-Bold", fontsize="16", style="bold" ];
	graph [ rankdir="LR", ranksep="0.4"];
	{ rank = same; B, D }
	
	A -> B [ label = "3", color="red"];
	B -> C [ label = "2"];
	B -> E [ label = "1", color="red"];
	E -> C [ label = "3", color="red"];
	A -> D [ label = "2"];
	D -> C [ label = "3"];

}


This work is ineligible for copyright and therefore in the public domain because it consists entirely of information that is common property and contains no original authorship.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts Kiingereza

12 Januari 2007

MIME type Kiingereza

image/svg+xml

checksum Kiingereza

0059fb64a355c106ad6601fbc9aa712ea8c443a3

data size Kiingereza

3,920 Baiti

188 pixel

width Kiingereza

405 pixel

Historia ya faili

Bonyeza tarehe/saa kuona faili kama ilivyoonekana wakati huo.

Tarehe/SaaPicha ndogoVipimoMtumiajiMaelezo
sasa hivi13:07, 13 Januari 2007Picha ndogo ya toleo la 13:07, 13 Januari 2007405 × 188 (4 KB)Illes{{Information |Description=The graph was created with Graphviz from the graph specification below. |Source=own work |Date=January 12, 2007 |Author=hu:User:Illes |Permission=The image is in the public domain. }} <pre> digraph untitl { node [ fontname=

Ukurasa huu umeunganishwa na faili hili:

Matumizi ya faili ulimwenguni

Wiki nyingine hutumia faili hizi: